How it works

Solar, explained without the jargon.

How the sun ends up running your fans, what net billing means for you, and every step from the first visit to the green meter.

How solar power flows through your home Sunlight reaches the solar panels on the roof. The panels send power to the inverter, which feeds your home first, charges the battery with what is left over, and sends any extra to the grid. Sun Solar panels Inverter Battery Your home Grid

Where your power comes from.

  1. Panels catch the sun

    Solar panels turn daylight into electricity, even on hazy days.

  2. Your building uses it first

    The inverter turns panel power into the electricity your sockets use. Fans, ACs and the fridge run on it first, so you buy less from the grid.

  3. Spare power fills your battery

    Extra energy charges your battery, ready for the evening and for load shedding.

  4. Anything left goes to the grid

    When the battery is full, spare power goes to the grid. Under net billing it earns much less than it saves you at home, so we size your system to use as much as you can yourself.

Net billing

What changed in February 2026.

On 9 February 2026 NEPRA replaced net metering with net billing for new solar customers. Here is what that means on your bill.

  • Every unit you take from the grid is charged at your normal tariff, with the usual taxes.
  • Every unit you send to the grid earns a much lower rate, set by NEPRA and changed from time to time.
  • The two are settled on each monthly bill. If you are owed money, it carries forward or is paid every three months.
  • Agreements last five years and can be renewed.
  • If you signed with your DISCO before 9 February 2026, you keep the old one-for-one net metering until your agreement ends.

What it means in practice: use as much of your own solar as you can, in the day and, with a battery, in the evening. Fixed charges on your sanctioned load and some taxes stay on every bill.

A unit you use yourself saves

about Rs 55

A unit you send to the grid earns

about Rs 8

Typical 2026 figures. Tariffs and the NEPRA export rate change; our calculator always uses the current ones.
Sanctioned load

The number on your bill that sets the size of your system.

Your sanctioned load is the most load your DISCO has approved for your connection, in kW. Look near the top of your bill for "Sanctioned Load" or "San Load".

Under the 2026 rules a grid-connected solar system cannot be bigger than it. Your fixed charges are also worked out from it. If your home needs a bigger system, the load can be raised with an application to your DISCO, and to connect solar with a green meter you need a three-phase connection. We arrange both.

Where to look on your bill An example DISCO electricity bill. 1: Sanctioned Load is in the box near the top, next to the tariff. 2: Units Consumed is next to the previous and present meter readings. 3: Payable Within Due Date is near the bottom. ELECTRICITY BILL REFERENCE NO TARIFF BILL MONTH SANCTIONED LOAD 5 kW CONNECTION PREVIOUS READING PRESENT READING UNITS CONSUMED 350 HISTORY PAYABLE WITHIN DUE DATE
1 Sanctioned load, 2 units consumed, 3 the amount. Every DISCO lays its bill out a little differently.
Our process

From the first visit to the green meter.

Six steps. We explain each one before it happens, and you always know who to call.

  1. A free visit

    We look at your roof, your wiring, your meter and your last bills, and ask what you want to keep running in load shedding.

  2. Design and written quote

    A system sized to your use and your sanctioned load, a drawing of where the panels go, and every item listed with its brand.

  3. Installation

    Our own team fits the frame, panels, inverter and battery. Most homes take one to two days; the power is off for a few hours while we connect.

  4. DISCO paperwork

    We file the net billing application, arrange a three-phase upgrade if you need one, and follow up the inspection and the agreement.

  5. Green meter and switch-on

    Your DISCO fits the two-way meter, usually within one to three months. Your system already powers your home before then.

  6. Looking after it

    We check everything after the first month, show you the app, and come when you call. Warranty claims go through us.

Questions

Net billing and your DISCO.

See all questions

What is net billing, and how is it different from net metering?

Under the old net metering, every unit you sent to the grid cancelled out a unit you bought, one for one.

Since NEPRA's Prosumer Regulations of February 2026, new customers are on net billing instead. The units you buy are charged at your normal tariff, but the units you send to the grid are paid at a much lower rate, set by NEPRA and changed from time to time.

So selling spare power no longer pays much. The best way to save now is to use your own solar: in the day, and in the evening with a battery.

I already have net metering. Does the new rule affect me?

If your agreement with your DISCO was signed before 9 February 2026, you keep the old one-for-one net metering until that agreement ends.

Be careful before adding panels: a big change to your system can move you onto the new rules. Talk to us before you expand.

What is sanctioned load, and where do I find it?

It is the most load your DISCO has approved for your connection, in kW. It is printed near the top of your bill as "Sanctioned Load" or "San Load".

Under the 2026 rules, a solar system connected to the grid cannot be bigger than your sanctioned load. If you need a bigger system, the load can be raised with an application to your DISCO. We can help with that.

Do I need a three-phase connection?

To connect solar to the grid with a green meter, yes: the rules ask for a three-phase connection. Homes with more than about 5 kW of load usually have one already.

If yours is single-phase, the upgrade is an application to your DISCO. We arrange it as part of the job.

What is a green meter, and how long does it take?

A green meter is a two-way meter. It records the units you buy and the units you send to the grid. Your DISCO fits it after approving your application.

Systems up to 25 kW are approved by the DISCO directly. Larger systems also need NEPRA's approval. It usually takes one to three months. We prepare the documents, file them and follow up until the meter is in.

Ready to see what solar could save you?

Tell us a little about your home or business. We will call you back, answer your questions and book a free site visit. No pressure, no obligation.

Associated partners

Panels, inverters and batteries from the brands we work with.

See products and brands