Industrial · Sargodha Road, Faisalabad · 2025

400 kW on-grid system for a textile unit

The day shift now runs largely on solar, on a three-phase industrial connection.

  • Aerial view of a large factory complex with solar panels covering several flat roofs
  • Two long warehouse roofs seen from straight above, completely covered in neat rows of solar panels
  • Workers in orange uniforms and white helmets install solar panels across a huge factory roof, with hills behind
  • Four installers in high-visibility overalls and white hard hats placing solar panels on a metal roof in the sun

The system in numbers

Solar system
400.2kW
Panels
690
Monthly bill: Rs 39 lakh before, Rs 28 lakh after
28% lower
To pay for itself, roughly
2.3years

How it went

A weaving and finishing unit running a long day shift on an industrial connection, with a monthly bill of about Rs 39 lakh.

The warehouse roofs are corrugated steel, so we used clamp rails that fix to the roof sheet without drilling through it, with walkways between the rows for cleaning. Eight 50 kW inverters, surge protection on every string and a monitoring screen in the office complete the plant.

At 400 kW the system needed NEPRA approval and a load-flow study of the grid nearby, which we prepared and followed up. Because the machines run while the sun is up, the unit uses nearly all of the power itself.

Ask for a system like this

They came back three times to check our roofs and our load before giving a price. The plant has done what they said it would.

Plant manager, Faisalabad